Gallery - A selection of photos from IFAB

IFAB - FABRICATION AND MARINE FACILITY

Located adjacent to the quayside at Invergordon's Queen's Dock, our fabrication facility sits within one of Europe's premier ports. By virtue of its location, our fabrication facility has the ability to load out major structures direct to offshore locations. Sheltered and benefiting from deep water, the Queen's Dock is accessible 24 hours a day, 365 days a year.

Recently expanded as part of a £5m investment, our Invergordon site is made up of six workshops, two piping warehouses and a specialist paint and blast area.


IFAB Fabrication Facilities

West Facility
Structural Fabrication Workshop 1 – 15.3m x 29.2m (446 sq. m)
Structural Fabrication Workshop 2 – 13.8m x 62.0m (855 sq. m)
Structural Fabrication Workshop 3 – 24.4m x 32.9m (803 sq. m)
Piping Warehouse 2 – 12.0m x 36.0m (432 sq. m)
Paint and Blast Shop – 16.0m x 48.0m (768 sq. m)

East Facility
Pipework Fabrication Workshop 4 – 24.0m x 31.0m (744 sq. m)
Pipework Fabrication Workshop 5 – 18.0m x 31.0m (558 sq. m)
Pipework Fabrication Workshop 6 – 18.0m x 21.7m (390 sq. m)
Piping Warehouse 1 – 30.0m x 40.0m (1200 sq. m)

Cromarty Firth Service Base Facilities

Quay 1 – 50m long and 50T mooring bollards, minimum water depth 7m.
Quay 2 – 150m long with 50T and 200T mooring bollards, minimum water depth 8.9m.
Quay 3 – 87m long with heavy lift pad (1000T crane capacity) 23m x 36m, minimum water depth 8.9m
Quay 4 – (Deepwater Berth) – Suitable for semi-submersible rigs, 200T mooring bollards, minimum water depth 14.5m.
Quay 5 – (Queen's Dock) – 150m long with 50T and 250T mooring bollards. Suitable for semi-submersible rigs.

 

Latest News

Visit Port services Group website

Visit Scrabster Port services website

Visit PS Wind website



Design by Catch PR I IFAB © 2012